GREEN TRANSFORMATION AND SUSTAINABLE DEVELOPMENT OF KEY INDUSTRIES IN SURKHANDARYA REGION THROUGH RESOURCE EFFICIENCY
DOI:
https://doi.org/10.5281/zenodo.22853973Abstract
The study examines the dynamics of green transformation and resource efficiency in the energy and industrial system of the Republic of Uzbekistan, with a particular focus on the Surkhandarya region, drawing on the Porter hypothesis, decoupling theory, and the Brundtland Commission’s sustainable development framework. Official data from the government, the Central Asian Development Bank, the International Energy Agency (IEA), Enerdata, and the Ministry of Energy are used for four reference dates: 2019, 1 January 2023, end-2025, and 1 June 2026. Using objective coefficient-of-variation weighting, a composite Green Transformation and Resource Efficiency Index is constructed from three indicators: installed renewable energy capacity, total installed generation capacity, and the share of renewables in total installed capacity. The index increased from 0.355 in 2019 (“Low” level) to 0.405 on 1 January 2023 (“Medium” level) and reached 0.986 by end-2025 (“Very High” level). The Surkhandarya case study examines three resource-efficiency-oriented projects: the 456.7 MW Sherabad solar photovoltaic power plant, the modernised and export-oriented AMMC Sherabad cement plant, and the Surkhon-Agro Free Economic Zone. The findings indicate that resource-efficiency-oriented industrial policy can contribute to strengthening regional competitiveness and reducing poverty. At the same time, continued dependence on natural gas and existing constraints in electricity transmission and energy-storage infrastructure are identified as key factors affecting the pace of the green transition. The study develops policy recommendations aimed at accelerating investment in electricity grids and energy-storage systems, strengthening energy-efficiency requirements for newly commissioned industrial capacity, and systematically monitoring regional progress against national green-economy targets.Keywords
green transformation, resource efficiency, sustainable development, renewable energy, Surkhandarya, Uzbekistan, composite index, coefficient of variation, regional industrial policy, green economyReferences
1. Georgescu-Roegen, N. The Entropy Law and the Economic Process. – Cambridge, MA: Harvard University Press, 1971.
2. Daly, H. E. Beyond Growth: The Economics of Sustainable Development. – Boston: Beacon Press, 1996.
3. Porter, M. E.; van der Linde, C. Toward a New Conception of the Environment-Competitiveness Relationship. (1995). Journal of Economic Perspectives, 9(4), 97–118.
4. OECD. Towards Green Growth. – Paris: OECD Publishing, 2011.
5. Fischer-Kowalski, M.; Swilling, M.; et al. Decoupling Natural Resource Use and Environmental Impacts from Economic Growth. – Nairobi: UNEP International Resource Panel, 2011.
6. International Energy Agency. Uzbekistan Energy Profile. – Paris: IEA, 2022. – URL: https://www.iea.org/ reports/uzbekistan-energy-profile
7. International Renewable Energy Agency. World Energy Transitions Outlook. – Abu Dhabi: IRENA, 2023.
8. OECD. Handbook on Constructing Composite Indicators: Methodology and User Guide. – Paris: OECD Publishing, 2008.
9. International Energy Agency. Solar Energy Policy in Uzbekistan: A Roadmap. – Paris: IEA, 2022. – URL:
10. Energyprof. Uzbekistan: Full Steam Ahead with Renewables [Electronic resource]. – 18 December 2025. – URL: https://energyprof.substack.com/p/uzbekistan-full-steam-ahead-with
11. Diplomat Magazine. “Green” Energy in Uzbekistan: Prospects of Solar and Wind Power Plants [Electronic resource]. – URL: https://www.diplomatmagazine.cn/list_99/835.html
12. UzDaily.uz. Uzbekistan Outlines Tasks to Fully Harness Surkhandarya Region’s Potential [Electronic resource]. – Tashkent, 24 December 2025. – URL: https://www.uzdaily.uz/en/uzbekistan-outlines-tasks-tofully-harness-surkhandarya-regions-potential/
13. Enerdata. Uzbekistan Plans 6.7 GW of New Capacity, Including 2.5 GW Thermal, by 2026 [Electronic resource]. – 26 February 2026. – URL: https://www.enerdata.net/publications/daily-energy-news/ uzbekistan-plans-67-gw-new-capacity-including-25-gw-thermal-2026.html
14. Enerdata. ACWA and Sumitomo Partner to Develop 2.5 GW of Renewables in Uzbekistan [Electronic resource]. – 1 October 2024. – URL: https://www.enerdata.net/publications/daily-energy-news/acwa-andsumitomo-partner-develop-25-gw-renewables-uzbekistan.html
15. International Renewable Energy Standards and Framework Board. Standard Terms and Conditions for Registration and Issuing (V3.1): Uzbekistan Country Report. – 14 June 2023. – URL: https://www. trackingstandard.org
16. Trend.az. Uzbekistan’s Power Generation Rises on Back of Renewable Energy Growth [Electronic resource]. – 17 June 2026. – URL: https://www.trend.az/business/green-economy/4199031.html
17. Kun.uz. Uzbekistan Draws Nearly $35 Billion in Energy Investment, Targets 50% Renewables by 2030 [Electronic resource]. – 14 May 2026. – URL: https://kun.uz/en/news/2026/05/14/uzbekistan-draws-nearly- 35-billion-in-energy-investment-targets-50-renewables-by-2030
18. Kun.uz. Cement Plant Worth $144 Million Commissioned in Surkhandarya [Electronic resource]. – Tashkent, 18 October 2019. – URL: https://kun.uz/en/news/2019/10/18/cement-plant-worth-144-millioncommissioned-in-surkhandarya
19. Grokipedia. Surxondaryo Region [Electronic resource]. – URL: https://grokipedia.com/page/Surxondaryo_ Region
20. Masdar. 457 MW Sherabad Solar Project, Surkhandarya Region, Uzbekistan: Fact Sheet [Electronic resource]. – URL: https://masdar.ae/-/media/corporate/projects/downloads/sherabad-solar-project/factsheet----sherabad.pdf
21. Asian Infrastructure Investment Bank. Uzbekistan: Masdar 897 MW Solar PV Portfolio (Samarkand, Jizzakh and Sherabad Solar PV Plants) [Electronic resource]. – URL: https://www.aiib.org/en/projects/details/2023/ approved/Uzbekistan-Masdar-897MW-Solar-PV-Portfolio-Samarkand-Jizzakh-and-Sherabad-solar-PVplants.html
22. Asian Development Bank. 55101-001: Sherabad Solar Power Project [Electronic resource]. – URL: https:// www.adb.org/projects/55101-001/main
23. President of the Republic of Uzbekistan. Decree Establishing the “Surkhon-Agro” Free Economic Zone, Sherabad District, Surkhandarya Region. – Tashkent, 25 March 2026.
24. HortiDaily. Uzbekistan to Establish Greenhouse Economic Zone in Surkhandarya Region [Electronic resource]. – 30 March 2026. – URL: https://www.hortidaily.com/article/9824543/uzbekistan-to-establishgreenhouse-economic-zone-in-surkhandarya-region/
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 ECONOSCITECH INTEGRATION

This work is licensed under a Creative Commons Attribution 4.0 International License.
