A RISK-BASED AUDIT METHODOLOGY FOR ELECTRICITY LOSSES IN DISTRIBUTION UTILITIES: EVIDENCE FROM UZBEKISTAN
DOI:
https://doi.org/10.5281/zenodo.23831434Abstract
Electricity losses are the largest expense of distribution utilities, yet they are typically recorded in aggregate and audited using general-purpose procedures. At the Jizzakh branch of Hududiy Elektr Tarmoqlari (HET) JSC, losses amounted to UZS 207.3 billion, or 90.3% of selling expenses, in 2024. This paper develops and calibrates a risk-based audit methodology for such losses. The audit risk model is extended by dividing control risk into technical (metering and data systems) and administrative components; the required detection risk and monetary-unit sample sizes are derived analytically; and the loss statistics of all 14 HET branches for 2024–2025 are examined using analytical procedures. Overall materiality (5% of selling expenses) is UZS 11.48 billion, equivalent to approximately one percentage point of the branch’s loss ratio, while a systematic 0.5% bias in input metering alone would misstate the loss amount by UZS 5.58 billion, exceeding specific materiality (UZS 3.44 billion). With an audit risk of 0.10, the required sample size decreases from 99 monetary units under the current control environment to 42 when both control components are remediated. The analysis shows that all 14 branches reported lower loss ratios in 2025 (relative declines of 3–35%). However, the commercial component of losses was negative in eight branches and decreased in only four, while the reported decomposition could not be independently recalculated. Jizzakh and Samarkand are assigned the highest audit priority. The 47-day audit programme is revised to address an insufficient allocation of time to planning and the absence of a scheduled confirmation of purchased electricity volumes. The results provide auditors of regulated distribution utilities with a transparent basis for determining the scope and sample sizes of electricity loss audits.Keywords
electricity losses, audit risk, materiality, monetary-unit sampling, analytical procedures, distribution utilities, UzbekistanReferences
1. Antmann, P. (2009). Reducing technical and non-technical losses in the power sector [Electronic resource] / P. Antmann. https://documents1.worldbank.
2. Arens, A. A. (2020). Auditing and assurance services / A. A. Arens, R. J. Elder, M. S. Beasley, C. E. Hogan.
3. Cabinet of Ministers of the Republic of Uzbekistan. O‘zbekiston Respublikasi hududida qo‘llash uchun auditning xalqaro standartlarini tan olish tartibi to‘g‘risidagi nizomni tasdiqlash haqida [On approval of the regulation on the procedure for recognising international standards on auditing for use in the territory of the Republic of Uzbekistan] [Electronic resource]. – Resolution No. 171 of 11 April 2022. – National Legislation Database registration No. 09/22/171/0293. – Lex.uz. – URL: https://lex.uz/docs/-5952173.
4. Depuru, S. S. S. (2011). R. Electricity theft: Overview, issues, prevention and a smart meter-based approach to control theft / S. S. S. R. Depuru, L. Wang, V. Devabhaktuni. Energy Policy, 39(2), 1007–1015.
5. Durtschi, C. (2004). The effective use of Benford’s law to assist in detecting fraud in accounting data / C. Durtschi, W. Hillison, C. Pacini. Journal of Forensic Accounting, 5(1), 17–34.
6. HET, J. S. C. (2025). Statistical report on electricity losses by regional branches, January–December 2025 [Unpublished internal report].
7. HET, J. S. C. (2022). Jizzakh Branch. Selling expenses and electricity losses: Internal reporting [Unpublished internal reports].
8. Institute of Internal Auditors. The IIA’s Three Lines Model: An update of the Three Lines of Defense [Electronic resource]. – 2020. – URL: https://www.theiia.org/globalassets/documents/resources/the-iiasthree-lines-model-an-update-of-the-three-lines-of-defense-july-2020/three-lines-model-updated-english. pdf.
9. Institute of Internal Auditors. Three Lines Model: Assurance and advice in support of effective governance [Electronic resource]. – 2026. – (Statement of position). – URL: https://www.theiia.org/globalassets/site/ resources/statements-of-position/tlm_assurance_advice_support_effective_gov_en.pdf.
10. Ministry of Economy and Finance of the Republic of Uzbekistan. International standards on auditing [Electronic resource]. – URL: https://gov.uz/oz/imv/sections/view/22099.
11. Ministry of Finance of the Republic of Uzbekistan. Xo‘jalik yurituvchi subyektlar moliyaviy-xo‘jalik faoliyati buxgalteriya hisobi hisobvaraqlar rejasi va uni qo‘llash bo‘yicha yo‘riqnoma (21-sonli BHMS) [Chart of accounts for the financial and economic activity of business entities and instructions for its application (National Accounting Standard No. 21)] [Electronic resource]. – Order No. 103 of 9 September 2002. – Registered by the Ministry of Justice on 23 October 2002, No. 1181. – No longer in force from 1 January 2025. – Lex.uz. – URL: https://lex.uz/en/acts/-809350.
12. Nigrini, M. J. (2012). Benford’s law: Applications for forensic accounting, auditing, and fraud detection / M. J. Nigrini.
13. Shodiyev, A. A. (2024). Elektr energiyasini yetkazib berishda texnologik yo‘qotishlarni standartlashtirish [Standardisation of technological losses in electricity supply] / A. A. Shodiyev. Iqtisodiyot va innovatsion texnologiyalar, 12(6). https://doi.org/10.55439/EIT/vol12_iss6/624
14. Smith, T. B. (2004). Electricity theft: A comparative analysis / T. B. Smith. Energy Policy, 32(18), 2067–2076. https://doi.org/10.1016/S0301-4215(03)00182-4
15. Suyunov, J. (2026). O‘. Tartibga solinadigan tariflar va bozor islohoti sharoitida elektr energiyasini taqsimlash korxonasida daromad va hisob-kitoblar hisobining kontseptual modeli [A conceptual model of accounting for revenue and settlements in an electricity distribution enterprise under regulated tariffs and market reform] / J. O‘. Suyunov. Aktuar moliya va buxgalteriya hisobi ilmiy jurnali, 6(10), 230–236. https://doi.org/10.55439/AFA/vol6_iss10/1552
16. World Bank. Uzbekistan to invest in modernizing electricity distribution networks with World Bank support [Electronic resource]. – 15 May 2025. – (Press release No. 2025/ECA/101). – URL: https://www.worldbank. org/uz/news/press-release/2025/05/15/uzbekistan-to-invest-in-modernizing-electricity-distributionnetworks-with-world-bank-support.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 ECONOSCITECH INTEGRATION